Episode 9
The questions nobody asks: Due diligence in hydrogen
Episode 9 of the Chade Hydrogen podcast: hydrogen pitches show the best case, and the difficult questions are rarely answered — mostly because nobody with the right knowledge asks them. Six cases from fraud to hard lessons, and what an independent technical review gives you.
Watch / Listen
Watch on YouTubeKey takeaways
- Hydrogen does not fail for lack of information. It fails for lack of the right questions.
- “80% efficient”, “1 GW factory”, “500 trucks ordered” — every headline hides a question nobody asked.
- Nikola, Hyzon, Alstom iLint, ITM Power, Green Hydrogen Systems and HH2E share the same four-step story.
- An independent technical review means evidence, not slides — test data, operating hours and real projects.
- The best time to ask the hard questions is before you sign.
Episode guide








1 / 8
Related episodes
Episode 8
Solid oxide: The Specialist of electrolysis
Open episode
Episode 7
From announcement to FID: What makes hydrogen projects succeed?
Open episode
Episode 6
Technology Readiness Level (TRL) is not business readiness
Open episode
Episode 5
The hidden engineering challenges of scaling electrolysers
Open episode
Episode 4
Why hydrogen projects fail
Open episode
Episode 3
Scaling deep tech from lab to product
Open episode
Episode 2
Where hydrogen makes business sense
Open episode
Episode 1
Electrolysers: The battle for green hydrogen
Open episode